- Sparklight Idaho/Arizona
- Fiber Optic Splicing
- Setting up new splice cases
- OTDR testing
- Auditing of Existing Fiber
- Fiber Optic Design
- FTTH
- EPON Business Networks
- ($150,000) Idaho Falls Power Fiber Optic Infrastructure Upgrade
- Fiber Optic Splicing
- Setting up new splice cases
- OTDR testing
- Auditing of Existing Fiber
- ($80,000) Ziply Fiber Install
- Fiber Optic Splicing
- Setting up new splice cases
- OTDR testing
- E4 Connect (Nevada, Idaho, Oregon)
- Fiber Optic Splicing
- Setting up new splice cases
- OTDR testing
- Fiber Optic Design
- FTTH
- Albion Telephone
- Fiber Optic Splicing
- Setting up new splice cases
- OTDR testing
- FTTH
- College of Western Idaho
- Installed 200,000′ of cable in multiple buildings
- Tested, terminated, and certified cabling
- Fiber optic placement & splicing
- USLI
- Installed 50,000′ CAT6 Cabling
- Terminating, Testing, & Certifying
- Manufacturer Warranty Ortronics
- Linage Cold Storage
- Installing Wireless Access Points
- Point to Point Building Bridges
- Certified & Tested System
- Treasure Valley Community College
- Installed New 288 strand fiber ring around campus
- CAT6 Cabling in multiple buildings
- All systems were tested, terminated, and certified
- Gowen Field
- Installed new 288 strand fiber on block 500
- Tested, terminated, & certified cabling
- 300,000′ of CAT6 cable in multiple buildings
- Mates Tank Range
- Installed a 48 strand fiber between all targets
- Terminated, tested, and certified all cabling
- Mountain Home Airforce Base
- Repaired 432 strand fiber that was damaged
- Installed fiber optic cabling between multiple buildings
- Green River County Jail
- 250,000′ CAT6 Cable Installed
- System was certified, tested, and terminated