Ongoing Work
  • Sparklight Idaho/Arizona
    • Fiber Optic Splicing
    • Setting up new splice cases
    • OTDR testing
    • Auditing of Existing Fiber
    • Fiber Optic Design
    • FTTH
    • EPON Business Networks
2020
  • ($150,000) Idaho Falls Power Fiber Optic Infrastructure Upgrade
    • Fiber Optic Splicing
    • Setting up new splice cases
    • OTDR testing
    • Auditing of Existing Fiber
2021
  • ($80,000) Ziply Fiber Install
    • Fiber Optic Splicing
    • Setting up new splice cases
    • OTDR testing
2023
  • E4 Connect (Nevada, Idaho, Oregon)
    • Fiber Optic Splicing
    • Setting up new splice cases
    • OTDR testing
    • Fiber Optic Design
    • FTTH
  • Albion Telephone
    • Fiber Optic Splicing
    • Setting up new splice cases
    • OTDR testing
    • FTTH
Ongoing Work
  • College of Western Idaho
    • Installed 200,000′ of cable in multiple buildings
    • Tested, terminated, and certified cabling
    • Fiber optic placement & splicing
2022
  • USLI
    • Installed 50,000′ CAT6 Cabling
    • Terminating, Testing, & Certifying
    • Manufacturer Warranty Ortronics
2023
  • Linage Cold Storage
    • Installing Wireless Access Points
    • Point to Point Building Bridges
    • Certified & Tested System
  • Treasure Valley Community College
    • Installed New 288 strand fiber ring around campus
    • CAT6 Cabling in multiple buildings
    • All systems were tested, terminated, and certified
Ongoing Work
  • Gowen Field
    • Installed new 288 strand fiber on block 500
    • Tested, terminated, & certified cabling
    • 300,000′ of CAT6 cable in multiple buildings
2020
  • Mates Tank Range
    • Installed a 48 strand fiber between all targets
    • Terminated, tested, and certified all cabling
2020
  • Mountain Home Airforce Base
    • Repaired 432 strand fiber that was damaged
    • Installed fiber optic cabling between multiple buildings
  • Green River County Jail
    • 250,000′ CAT6 Cable Installed
    • System was certified, tested, and terminated